Large Business | FPL Simple Solutions for Energy Management Programs
 

Solutions for Energy Management


Do you hesitate at the thought of starting another project? Finding and hiring a design engineer. Bidding out the project. Selecting the contractor. And then hoping that change orders won’t blow your budget. Even if you handle projects in house, how much time does your staff have to spare?

FPL Services has a solution. And it’s as simple as one-stop shopping. From identifying energy-saving opportunities to managing large-scale construction projects, we can help. Give us a call and we’ll provide turnkey services, including help obtaining financing, on projects such as:

  • Lighting retrofits
  • HVAC installations and improvements
  • Central cooling plants
  • Backup generating systems
  • Energy management control systems
  • Motors, boilers and steam systems
  • Variable speed drives
  • Natural gas
  • Power quality solutions

Why FPL Services?

Product neutrality: You get the right technology for your business

FPL Services is a subsidiary of Florida Power & Light Company. We are a service provider, not a product vendor. So we have no obligation to manufacturers. We’ll find the best and most cost-effective technologies for your business, rather than adapting equipment to your project. And, if you have a preferred vendor, we can use their technologies with no conflict of interest.

One point of contact

With us, you have one point of contact for the entire project. The buck stops with us. And if something goes wrong, even years down the road, you know we’ll still be there to help.

A name you can trust

FPL has been in business in Florida since 1925 and knows your energy needs. We understand the special concerns of Florida businesses. And FPL Services has years of experience and expertise with the state’s environmental and building regulations.

Flexible financing arrangements

We can help you obtain the most flexible financing packages available, including rebates. We can arrange and administer local, state and federal funding for your project. Our goal is to keep your initial investment as low as possible while offering the greatest long-term operating savings.

“No surprises” energy efficient solutions

We make it easy for you

We make every step of the construction project easier for you. We’ll start with a complete feasibility study, identify energy-saving opportunities, and present a firm fixed price proposal for your approval. This means no change orders down the road. If you wish, we’ll also include financing options available to you in the proposal.

When we get the okay, you can be confident that your problems and hassles will be eliminated. We offer turnkey services that include:

  • Energy analysis, feasibility studies, and auditing
  • Engineering, design and implementation
  • Equipment procurement and installation
  • Construction supervision and management
  • Equipment commissioning
  • Staff training
  • Arranging project financing
  • Ongoing service and maintenance

Upgrade with no out-of-pocket expenses

With us, you can take advantage of energy-efficiency contracting, which lets you install energy-efficient equipment, water conservation measures, and other upgrades and pay for it out of energy savings. We will arrange financing and make sure that the project will pay for itself in a reasonable period.

We’ll help you determine which combination of projects will yield the greatest savings and fastest payback. Then, we’ll monitor the project to make sure you get the savings you’re promised.

Case studies of success

Here are examples of how two of our customers benefited by making improvements using FPL Services for their energy-related projects:

Business sense: Upgrades that pay for themselves

Project: Stand-By Generation and HVAC Installation

Business

Chicos Retailer

Improvement

Installed a new 1500 kW stand-by generator for the Ft. Myers headquarters to provide complete stand-by or back-up generation. Also installed a new 320 ton air conditioning system at the Georgia distribution center to convert the facility from a ventilation only cooling system to an air conditioned system.

Size

Ft. Myers headquarters – single story structure with multiple offices and open spaces; Georgia Distribution Center – 200,000 square foot warehouse and office space.

Project costs

$1,644,000

Results

The design-build projects provided complete building stand-by/back-up power to the Headquarters and comfort cooling to the Distribution Center . As a result, Chicos was able to improve their ability to provide 24 hour service to their customers and improve the comfort of their employees.

Business works: Breaking down the savings

Here’s an example of how one FPL Services customer saved by upgrading:

Project: Facility Upgrade

Business

NASA’s Solid Rocket Booster Assembly and Refurbishment Facility, Launch Control Center and Vehicle Assembly Building

Improvement

New chiller condenser pumps, replaced air compressor, lighting upgrades and replacements. Also, removed inefficient chillers and connected 3 facilities to a central energy plant.

Installation cost

$3.1 million

Incentive

$46,680

Annual savings

$442,500

Start saving today

For more information about FPL Services energy-saving programs please