FPL EVolution Home will permit, install and maintain a level 2 charger and the required 240-volt circuit in your garage for a faster and convenient charging experience. There is no upfront cost for equipment or installation. Just plug in and forget it – chargers will be programmed to automatically start charging so you can enjoy the benefits of unlimited weeknights and weekend off-peak charging.
Installation timing is dependent on a number of factors. On average, charger installs are estimated to be completed in two to three months for full installations, and one to two months for equipment-only installations. Read our FAQs for more details.
✔ $38 per month1
✔ Includes level 2 smart charger
✔ Charger installation and permitting of required 240-volt circuit2
✔ No upfront costs for equipment or installation
✔ On-bill payment
✔ Worry-free maintenance – we ensure chargers are working at optimal performance
✔ Easily adjust pre-programmed charging settings to meet your charging needs
✔ Yours to keep after the 10-year program term
✔ Cancel any time – subject to a cancellation fee
✔ Powered by 100% renewable energy
✔ $31 per month1
✔ Includes level 2 smart charger
✔ Charger installation using your existing, permitted 240-volt circuit
✔ No upfront costs for equipment or installation
✔ On-bill payment
✔ Worry-free maintenance – we ensure chargers are working at optimal performance
✔ Easily adjust pre-programmed charging settings to meet your charging needs
✔ Yours to keep after the 10-year program term
✔ Cancel any time – subject to a cancellation fee
✔ Powered by 100% renewable energy
Increase range confidence — Add 10 - 60 miles of range per hour of charging time.
Increase your savings — Reduce the cost of charging with unlimited off-peak charging on weeknights and weekends.
Faster charge time — Charges most EVs 4 - 12 times faster than a 120-volt, Level 1 charge. Charges a typical EV in 4 - 7 hours.
Smarter charging — Chargers will be pre-programmed to start charging during unlimited nights and weekends.
Cost savings that add up — Save up to $579 per year in fuel costs when compared to a standard ICE vehicle.
Stay connected — 24/7 online access to monitor charging and review charging history, and more, via the FPL EVolution mobile app.
Yours to keep! — At the end of the program term, the charger is yours to keep and use on your current or future EV.
Lower your environmental impact — Reduce your emissions by more than 8,000 pounds of CO2 every year when compared to a conventional vehicle.
Powered by renewables — Now your EV will run as clean as it was designed with charging powered by 100% renewable energy.
EV charging is simple, cost–effective, clean, and convenient, particularly when you are plugged in at home – filling up your car, even while you’re asleep.
Participants will need to complete a 3-step enrollment and installation process:
1. Confirm eligibility with a brief questionnaire, and accept the program’s price, terms and conditions
2. Complete the home electrical survey to begin the installation and permitting process (if required)
3. A qualified electrician from our trusted network will contact you about next steps and scheduling the installation
Each month, a flat program charge and off-peak charge*, for unlimited weeknights and weekends, will be added to your monthly FPL bill. On-peak rates will apply when charging outside of off-peak periods.
Certain eligibility criteria are required to install a home charger and enroll in FPL EVolution Home.
Full Installation customers must:
Equipment-Only Installation customers must:
On average, charger installs are estimated to be completed in:
Installation timing is dependent on a number of factors including your prompt completion of your home electrical survey and permit issuance times by your local building department for full installations.
Sign up and be among the first to get FPL EVolution Home program updates. Please note that completing this form does not enroll you in FPL EVolution Home.
Please allow a few moments for your submission to be processed. Once complete, you will see a confirmation page. Thank you for your patience.
Get the answers to some frequently asked questions about FPL EVolution and more. For additional information, please contact us at 833-919-0939.
1 Program pricing is based on current rates and is subject to periodic changes based on regulatory approval. See how your bill will break down, read the full rate details, and review the program terms & conditions.
2 The full installation program requires the 240-volt circuit be installed within 10 feet of the electrical panel.
Disclaimer – Throughout the course of each day, the demand for electricity moves up and down. During “peak” demand periods – such as summer afternoons when air-conditioning usage is high, for example – the cost of generating electricity is more expensive. There are also daily “off-peak” periods when electricity usage is lower, making the cost of producing electricity less expensive. System installation may take approximately 4-6 weeks after enrollment and will be subject to permit issuance times by your local building department as well as the approval by your homeowner’s association (if required). The early termination fee is $768.48 to cover the cost for the removal and redeployment of the equipment. After five years of participation, you can also choose to purchase the equipment at the remaining net book value of the equipment.