Download the FPL EVolution app
Easily locate and navigate to your closest charging station, check charger availability and explore nearby amenities.
With no upfront costs, we’ll install a new level 2 charger in the attached garage of your single-family home or townhouse.
Equipment-only install for $31* a month
• Use existing electrical 240-volt circuit
• Install or replace your charger with ours
• Completed in 1-2 months
Full installation for $38* a month
• Electrical work for a 240-volt circuit**
• All permitting (based on local timeline)
• Completed in 2-3 months
Summer
April 1 to Oct. 31
Winter
Nov. 1 to March 31
Holidays include: New Year’s Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day.
.
"The convenience of having a home charger cannot be overstated. It’s reassuring to know that I can charge overnight and my EV is ready to go each morning. The charger is easy to use, and the installation process handled by FPL was straightforward."
– Mike M., Ponte Vedra, FL
"I did some research on the cost savings and it was a simple choice of economics. You look at the cost of what I was paying for electricity and the savings were ten-fold. I would definitely recommend this program to anyone who asks me."
– Dan R., Juno Beach, FL
Enroll in EVolution Home
EVolution Home installation
Eligible participants must:
Additional reasons customers may not qualify for the program include:
If you have the required 240-volt circuit in your garage, you may choose the equipment-only installation and we will provide the charging equipment, charger setup up and hardwiring. The program is only available with the use of the FPL EVolution Home charger, and you will not be able to use existing charging equipment. If you do not have the required circuit, you would need to either have it installed or we will install it as part of a full installation.
Customers will be able to choose from two different Level 2 EV chargers.
See rates by region
FPL region
FPL Northwest FL region
Locate and charge your EV from the palm of your hand. With over 200 locations in Florida – find fast chargers by highways and corridors or power up with level 2 chargers at hotels, parks and more.
You will not be enrolled in the program. Your submission is complete when the confirmation page appears.
*Program pricing is based on current rates and is subject to periodic changes based on regulatory approval. See how your bill will break down, read the full rate details, and review the program Terms & Conditions.
View rates by region
**The full installation program requires the 240-volt circuit be installed within 10 feet of the electrical panel.
Disclaimer – Throughout the course of each day, the demand for electricity moves up and down. During “peak” demand periods – such as summer afternoons when air-conditioning usage is high, for example – the cost of generating electricity is more expensive. There are also daily “off-peak” periods when electricity usage is lower, making the cost of producing electricity less expensive. System installation may take approximately 4-6 weeks after enrollment and will be subject to permit issuance times by your local building department as well as the approval by your homeowner’s association (if required).