EV charging has never been easier
With no upfront costs, we’ll install a new level 2 charger in the attached garage of your single-family home or townhouse.
Already enrolled? Log in to check your status.
EV ready
Equipment-only install for $31* a month
• Use existing electrical 240-volt circuit
• Install or replace your charger with ours
• Completed in 1-2 months
Get a charger
Full installation for $38* a month
• Electrical work for a 240-volt circuit**
• All permitting (based on local timeline)
• Completed in 2-3 months
Enjoy unlimited off-peak charging. See the current summer and winter schedule:
Summer
April 1 to Oct. 31

Winter
Nov. 1 to March 31

Need to charge at other times? Just override the off-peak hours in the app and pay.
Holidays include: New Year’s Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day.
.
See what our customers say
"The convenience of having a home charger cannot be overstated. It’s reassuring to know that I can charge overnight and my EV is ready to go each morning. The charger is easy to use, and the installation process handled by FPL was straightforward."
– Mike M., Ponte Vedra, FL
"I did some research on the cost savings and it was a simple choice of economics. You look at the cost of what I was paying for electricity and the savings were ten-fold. I would definitely recommend this program to anyone who asks me."
– Dan R., Juno Beach, FL
- Automatically starts during unlimited off-peak hours – plug in and forget it.
- Compatible with all EV makes and models, including Teslas with an adapter.
- We provide remote service updates and maintenance.
- Specifications include:
- Level 2
- Hardwired connection
- 40 amps maximum
- 9.6 kW maximum
- Wall-mounted with 25 ft. cable
- J1772 connector
- Wi-Fi enabled
- ENERGY STAR® certified and UL Listed
- Need to charge at other times? Just override the off-peak hours in the app and pay.
- 10-year term, consistent with the charger’s expected useful life.
- You’ll own the charger at the end of the program term.
- You can purchase the charger for remaining net book value after five years.
- Early termination is possible with at least thirty (30) days written notice and a fee to cover the costs of uninstalling and removing the equipment. Read the full Terms & Conditions.

How-to-videos

Enroll in EVolution Home

EVolution Home installation
Frequently asked questions
Eligible participants must:
- Own a single-family home or townhouse with attached garage.
- Have a strong Wi-Fi signal in the charging location.
- Have an active residential account in good standing with no past due bills or payment extensions.
Additional reasons customers may not qualify for the program include:
- Have a pending connect or disconnect order.
- Account belongs to a business or is tax-exempt.
- Residence does not use a smart meter.
- Account is dedicated to a source other than the primary residence, like a lighting system or well.
If you have the required 240-volt circuit in your garage, you may choose the equipment-only installation and we will provide the charging equipment, charger setup up and hardwiring. The program is only available with the use of the FPL EVolution Home charger, and you will not be able to use existing charging equipment. If you do not have the required circuit, you would need to either have it installed or we will install it as part of a full installation.
Customers will be able to choose from two different Level 2 EV chargers.
- For full installation, we will install the charger including all electric work and permitting of a 240-volt circuit, for a hassle-free turnkey process. The program requires the circuit be installed within 10 feet of the electrical panel.
- For equipment-only installation, we will provide the charging equipment, charger mounting and hardwiring, but the customer is responsible for the electrical work and permitting associated with the addition of a 240-volt, 50-amp circuit.
- If a customer already has a previously installed 240-volt circuit, then the equipment-only installation may be elected by the customer.
- Throughout the day, energy demands fluctuate. During “peak” demand periods – such as summer afternoons when air-conditioning usage is high, for example – the cost of generating energy is more expensive. There are also daily “off-peak” periods when electricity usage is lower, making the cost of producing energy less expensive.
- From November through March, off-peak hours are Monday through Friday 10:00 pm to 6:00 am and 10:00 am to 6:00 pm; all weekends; and the holidays of Thanksgiving, Christmas and New Year’s Day.
- From April through October, off-peak hours are 9:00 pm to 12:00 pm; all weekends; and the holidays of Memorial Day, Independence Day and Labor Day.
See rates by region
FPL region
FPL Northwest FL region

Public on-the-go charging

Locate and charge your EV from the palm of your hand. With over 200 locations in Florida – find fast chargers by highways and corridors or power up with level 2 chargers at hotels, parks and more.
*Program pricing is based on current rates and is subject to periodic changes based on regulatory approval. See how your bill will break down, read the full rate details, and review the program Terms & Conditions.
View rates by region
**The full installation program requires the 240-volt circuit be installed within 10 feet of the electrical panel.
Disclaimer – Throughout the course of each day, the demand for electricity moves up and down. During “peak” demand periods – such as summer afternoons when air-conditioning usage is high, for example – the cost of generating electricity is more expensive. There are also daily “off-peak” periods when electricity usage is lower, making the cost of producing electricity less expensive. System installation may take approximately 4-6 weeks after enrollment and will be subject to permit issuance times by your local building department as well as the approval by your homeowner’s association (if required).