FPL collects a payment for all underground material provided to you and for the labor associated with removing the overhead cable, supplying the new underground cable, pulling the underground cable through the new conduit, and building the casing on the pole that will house the new cable.
Costs vary for an overhead to underground service conversion. If the request is for a standard residential service and the pole is located on your property, costs are based on tariff rates approved by the Florida Public Service Commission. To see rates, click here and go to Section 10.4. You will also incur expenses associated with the work performed by the electrician, an electrical permit and the burying of the FPL-issued conduit. (Note: Since this work may trigger building codes that require older home wiring to be brought up to today’s standards, it’s important to check with the proper authorities before getting started.) Once you’re ready to request a conversion, you can apply at fpl.com/construction.
A standard residential service ranges between 100 amps and 320 amps. Additionally, the future underground service would not exceed one bend in the ground. If you are not sure of the size of your service, check by looking at your FPL meter. If you see AC, ACD, ACP, ACR, 5C, 5CJ or 7C written on the meter, then your service qualifies.
Make sure that the trench route meets FPL specifications. Once this is done, call toll-free "Sunshine State One Call of Florida" at 1-800-432-4770 two full business days in advance to arrange to have the location of any buried lines marked. By law, anyone excavating must follow this procedure to ensure the safety of people and property.
Appointments typically take two to three weeks to schedule the work. Once the material has been purchased, installed and inspected by an FPL representative and the governing authority, you can request an appointment. Generally, your electrician will be present; FPL will disconnect the existing overhead service upon our arrival and the electrician will make the necessary changes on your equipment. In the meantime, FPL will remove the overhead service cable, build the housing for the cable on the pole, and pull the cable in the conduit. Once the electrician has completed the work, FPL will reconnect the service that same day.
When you look at the pole with your existing overhead service, look at the height of the current pole attachment and see if there are any cables originating from that height descending the pole in either a galvanized pipe or a U-shaped PVC guard. If this condition exists, you will need to count how many of these underground risers exist on the pole, and reflect it on the Overhead to Underground Conversion Sketch Form. If there is more than one pipe on the pole, you will need to contact your FPL representative. See examples below:
FPL will not install more than two underground risers on a pole because of potential safety issues with our employees. If there are more than two risers, employees are unable to climb the pole. When this condition exists, FPL will issue, at no additional cost to you, an underground box that needs to be installed at the base of the pole adjacent to the existing riser. FPL will then upgrade the cable in the existing riser to serve two properties instead of one. (Note: When installing the underground box or handhole, as FPL refers to it, you will need to enter the 90-degree bend from the pole into the box, leaving a break in the conduit, and extending the remaining conduit from this point on toward the location of the meter.)
If your proposed underground service route is in the back of your property and it interferes with future plans of adding a pool, then your best bet will be to install the pipe around the proposed pool area and as close to the property lines as possible, being diligent in maintaining appropriate safety clearances from power lines to pools. You will need to discuss these clearances with your FPL representative. Also keep in mind that this might affect the cost of the work.
It is the PSC’s and FPL’s position that it would be unfair to charge all customers a higher price to cover the cost of new underground service, since not everyone would get the benefit or necessarily be willing or able to pay the higher cost.
Similar to new service requests for underground service, conversions take into account the requirement that FPL provide electric service to all its customers in the most cost-effective manner available and this is typically an overhead system.
You may not realize it, but you did. For aesthetic reasons, many developers work with FPL and other utility companies to bury their lines when they are first planning out the construction of a new neighborhood. The added cost for underground service and other community amenities is typically included in the price you pay for a new home.
Usually, the basic costs are about a third more, but may be more if additional work needs to be done on supporting electrical facilities such as putting a section of an adjacent main line underground. The builder/homeowner is responsible for paying the cost difference between new overhead and new underground facilities prior to construction. The detailed cost components are provided in an FPL tariff that is available from your local FPL Project Representative. [See FPL Electric Tariff sheets 6.090-6.100.]
You can personally arrange to have your individual service drop converted from overhead to underground or seek conversion of all the neighborhood electrical facilities through your city or homeowners association. Converting an older community’s power lines from overhead to underground, however, can be very expensive and disruptive, especially in highly urbanized areas. In conversion, the applicant pays the total cost of the conversion, since service already exists that must be dismantled in addition to installing a whole new system.
Customers who wish to have the line to their home buried will also need to convert the meter can and downpipe to accept underground service. This requires a licensed electrician and in most cases an electrical permit. Since this work may trigger building codes that require older home wiring to be brought up to today’s standards, it’s important to check with the proper authorities before getting started. Homeowners also need to arrange for a trench to be dug from the pole to the meter location to hold FPL-provided PVC for the underground cable.
To convert your service, there is a flat fee of $651.49 that would be due to FPL along with possible additional costs that depend on a number of variables such as:
Existing neighborhood overhead lines can be converted if a community so desires. Anyone willing and able to pay the cost for the conversion and secure the necessary easements to place the facilities on private property may submit a written request. This includes local governments, large or small communities, builders and developers in a contained specific area such as a subdivision.
Generally, yes, due to the following conditions for such conversion. Easements: All the easements (property use agreements from owners) must be acquired before an underground electrical distribution system can be installed. If FPL can design around an occasional customer who refuses to provide an easement – without jeopardizing the integrity of its electrical system – FPL will attempt to do so. In the case of converting to underground, this also means deciding whose property will accept the new padmounted transformer(s) and fairly large switch cabinet(s) that sit above ground as part of the underground grid. Cost: It’s also necessary for all the requesting parties to determine and agree in advance and on the allocation of the conversion costs among those benefiting from the project before FPL can begin construction. Otherwise, subsequent disagreements can bog down the conversion effort and drive up costs. Since FPL’s tariff requires full payment of the calculated customer contribution amount prior to beginning construction, customers may want to consider other options to offset some of the project costs. These options could include taking responsibility for doing some of the boring and/or trenching and installing the conduit. Regardless of who does the work, the installation must meet FPL standards for safety and reliability and local electrical and building-code requirements.
Yes, that’s an option. The tariff requires only that the work be performed to FPL standards and the facilities be maintained and operated by FPL. We are currently working on drafting the appropriate agreements to be able to allow our customers this option. We should have more information in the next several months.
The two key drivers contributing to the cost calculations are labor and materials. Depending on these factors, underground facilities can cost anywhere from $500,000 per mile to more than $4 million per mile. While these figures have a considerable amount of variability, there is a process in place where we generate a “ballpark” estimate to assist in determining the magnitude of the cost a community may be considering.
In 2003, FPL set up a PSC-approved rule and process (tariff) for cities who wanted to have the option of converting to underground in designated areas and who needed a mechanism to recover their costs. Under this new tariff, a city could pay to make the conversion and then recover its costs over a designated timeframe by having FPL add an underground fee on the bills of those customers in their jurisdiction who would be benefiting from the conversion. (Fees may not exceed [1] 15 percent of a customer’s bill or [2] $30 for residential and $50 for every 5,000 kilowatt-hour commercial.) No such arrangements have as yet been established in our service territory under this new tariff.
Yes. For cities, FPL recently established, with PSC approval, a mechanism to recover the costs associated with converting from overhead to underground by adding a fee to customer bills. Additionally, Chapters 197 and 170 of the Florida Statutes allow municipalities to fund underground conversion costs by levying special assessments imposed on tax bills. Landowners benefiting from the conversion must be identified and the special assessment may be collected directly from the local government imposing the assessment or through annual property tax bills. Another Florida Statute – 125.01(q) – lets counties establish municipal service benefit units and municipal service taxing units in certain areas. These governmental units may levy service charges, special assessments or taxes within these units to fund underground conversion costs.
While conduit and cable can be placed underground, which eliminates poles and wire, transformers and switch cabinets need to be accessible to FPL crews at ground level for timely maintenance, outage repairs, rerouting power and other functions.
Directional boring is generally preferred in conversions to minimize impact on other utilities, which are generally buried higher in the ground than electrical conduit and cable. Directional boring, while it may save on site restoration costs, is substantially more expensive work to perform. Open trenching is usually preferable for the paying party because it is the least expensive method available. In addition, an advantage of trenching is that other underground utilities may use the same trench, reducing the collective cost of burying all different facilities. This, however, requires significant coordination. A disadvantage of open trenching is the amount of surface restoration required – such as landscaping and sidewalks. Given that the locations of other utilities are not always known, especially in older communities, there is still a risk associated with both trenching and boring that may impact other subsurface utilities, such as water and sewer lines, gas lines or drainage lines.
Front easements are required for new construction, and are also typically required for conversions from overhead to underground as they allow for quicker access to the facilities. Should a power outage occur, facilities in the rear of a property may be inaccessible due to locked gates or dogs on the property. The inability to get to transformers and other equipment could delay the restoration of an entire neighborhood. FPL would consider locating easements in the rear of the property if an access road or alley existed that would allow for quick access to the facilities. The 10-feet easement requirement would still apply.
Ten feet is our standard easement requirement for “front” distribution neighborhoods in order to provide: (a) adequate space for the necessary pad-mounted transformer and underground cables (b) sufficient area for FPL crews to safely work away from roadways and (c) enough room for other utilities that might occupy the same easement to install future cable and conduit without interfering with the electric transformers located in the same vicinity. Each pad-mounted switch cabinet requires a 20-foot by 20-foot easement for installation and operation.
Typically, the only facilities FPL places in the public right-of-way are those necessary to cross under streets, like cable and conduit. The reason is that otherwise every road widening or improvement project could potentially compromise the company’s ability to deliver safe, reliable, uninterrupted power. On the other hand, if a local government was to offer FPL an easement or equivalent (a signed legal agreement) located in the public right-of-way, we would consider this alternative only if we cannot physically install the cable in private property. Only cable and conduit are allowed in the public rights-of-way in these rare cases. These public right-of-way easements would also need to be legally conveyed and expressly reserved on FPL record drawings. However, it’s been our experience that local governments are reluctant to grant such right-of-way easements or easement equivalents. As for other facilities and equipment needed for underground, such as primary splice boxes, transformers and switch cabinets, these components of the underground system would still need private property easements for us to be able to routinely access and maintain the equipment and ensure reliable service.
For system reliability reasons, FPL will only convert the system to underground if one full block or more is converted at the same time. FPL's typical underground system is a "looped" system, which means power can be supplied to the same transformer from two different directions. Depending on the location, more than one block may need to be converted in order to complete this "loop."
In conversions, FPL’s costs are significant. The work includes building a whole new system, while operating the existing service and then dismantling the existing service once the new one is up and running. The higher costs also reflect the fact that conversions in older neighborhoods – regardless of the type of excavation we use (boring or trenching) – have a lot of issues associated with working in-and-around and avoiding impact to other utilities such as phone, cable, sewer, gas lines, water lines, etc. Finally, all new underground components must be acquired and installed, including conduit, cable (wire), pad-mounted transformers and switch cabinets. Additionally, shared main line work is usually required, which is even more costly than converting individual service and neighborhood lines. Typically, dismantling represents about 15 percent of the cost, installing underground components about 65 percent, and actual excavation about 20 percent.
Converting from an overhead to an underground system means basically abandoning an existing working grid system. The logistics of converting an existing grid system in an established neighborhood can be considerably more expensive and disruptive to personal property and surroundings than, for example, building new. For example, utilities often share poles above ground, so that if the objective is to move utilities underground – it’s not just electrical service that needs to be considered, but also phone, cable television and Internet service. This then presents additional considerations, such as different spacing requirements, boring and/or trenching needs and ground-level switching boxes involved in providing each type of service. Driveways, sidewalks, fences, landscaping, sprinkler systems and yards may need to be torn up or may be inadvertently damaged if not clearly delineated. Entry and exit ways to homes and business could be impacted for extensive periods of time. Because permits are needed to change meter-related equipment, conversions in older homes and neighborhoods may end up triggering city or county requirements that homeowners/businesses bring interior wiring up to current code. This could require the expense of a licensed electrician and potentially extensive interior rewiring and remodeling. Finally, legal easements are needed from all conversion participants that allow FPL access to its underground equipment, including the above-ground components – and a number of people must agree to have the large green transformer box and pad or other switching boxes in their yards.
Typically, it may take from two to three weeks. This time period may vary depending on several factors such as:
Examples include instances in which private property owners aren’t willing to provide the easements that are necessary for FPL to design and engineer the conversion; locations where necessary safety standards and operational clearances cannot be met, for example extremely congested areas where switch cabinets cannot be installed with sufficient operating clearances; and areas prone to flooding. (Excessive flooding can short out transformers, which then cannot be safely restored until flood waters recede.)
Actually, our experience is limited, as many government entities or neighborhoods have abandoned the idea after fully investigating the impacts. In other cases, voters have determined the disadvantages of conversion outweighed the advantages and have failed to authorize funding. Some exceptions have involved city-initiated, limited-scope conversions involving primarily a few downtown streets, such as in beach towns in Miami-Dade, Broward, Palm Beach and Sarasota counties.
FPL is working on establishing a comprehensive, standard plan and process that takes into account the many variations in types of facilities and different population densities across the system. The “ballpark" estimate is simply an order of magnitude (for example – $5,000 vs. $500,000) to assist the requestor in determining if they want to move forward with a conversion project and seek a binding estimate. Unfortunately, due to innumerable variables, there is no single blanket cost.
All estimates are actual “for-construction” estimates good for a period of 180 days where all material and labor are inventoried in our computer-based estimating system. This is the same system used for construction estimates for all FPL work system-wide. In addition, the PSC rule governing overhead to underground conversions specifies exactly how the charges are to be calculated. [See Florida Administrative Code 25-6.115, and FPL’s Electric Tariff sheets 6.300 – 6.330, specifically.]
Some salvage credits may be available. Salvage value is only given for equipment that can be removed from the field and then re-issued for use with no testing or refurbishing required before re-use such as concrete poles. Typically these credits are not significant. [See FPL Electric Tariff sheet 6.300].
Depending on the density of a new development and exclusive of other facility needs, it costs FPL between $1,344 and $2,272 per lot to install our standard overhead service. Underground, on the other hand, costs between $1,052 and $2,414 per lot. The builder/homeowner selecting to have underground service pays up to $266 in differential cost. In addition, if main feeder lines are required to serve the subdivision, and the developer requests those be placed underground also, there is an additional differential charge of $9.02 per foot of main line and $27,200 per pad-mounted switch cabinet installed. In a typical 100-lot subdivision needing main feeder work and about two switch cabinets and related equipment, this could add an additional $60,000 to the project, doubling or tripling the per-lot differential cost.
FPL has approximately 67,000 miles of distribution lines serving its 4.7 million customers in all or parts of 35 counties in Florida. In addition, we also have about 6,500 miles of transmission lines. More than one-third of FPL’s system – or in excess of 24,000 miles – is underground. Often it’s as a result of municipalities having set underground requirements, the costs of which are borne by builders and developers and ultimately by customers in the price they pay for real estate. However, it’s important to remember that lines eventually come above ground, so no system is totally underground.
FPL transmission lines – that is, those large power lines that move power over long distances like an interstate highway from power plants to our neighborhoods – are rarely ever placed underground due to their complexity and considerably higher costs, as well as security and reliability considerations. The cost of placing these lines underground can be five to 15 times more costly than an overhead transmission line.